Free MMC suitability screen
Your project's MMC suitability,
screened in minutes.
Answer ten questions about your project or programme and get an independent read on whether industrialised construction is worth investigating, with a score out of 5 and what is holding it back.
Built by Slattery.

Illustrative example, from a sample project.
What is industrialised construction?
Modern methods of construction (MMC) is an umbrella term for approaches that shift construction activity from site to factory, while applying manufacturing principles such as standardisation, repeatability, quality control and digital production. Prefabrication, modular, volumetric, panelised, kit of parts and design for manufacture and assembly all sit inside it.

From your project details to
a credible first read
A result you can
actually act on
The screen gives you a directional view of MMC suitability, built on transparent logic and Slattery's project experience and research.

MMC procurement is moving
faster than the decision tools
Every state now has an industrialised construction stream, the Commonwealth has put nearly $160 million behind prefabrication since August 2026, and NSW has written prefabricated buildings into law. Community housing providers and state agencies are being asked to consider MMC on every programme, and few have a defensible way to get a directional read before they commit. MMC options close off once a project is too far down the track, so an early screen forces the right questions while there are still choices: before design is fixed and before procurement is set.
Now you have a result.
Next, test it.
The MMC Suitability Screen is a free, directional first screen. Feasibility reviews and programme advice are Slattery advisory services.
Why the screen asks about decisions, not products
Industrialised construction is broader than manufacturing more of a building off site. It means applying greater standardisation, repeatability and integration across the entire process of designing, procuring and delivering it. Standardised documentation, procurement, carbon planning, build sequencing and risk allocation matter as much as the manufactured components.
Slattery's case studies show cost, programme and carbon outcomes are set by choices about standardisation, procurement and pipeline, not by the point at which a component leaves the factory. Repetition, not the first project, unlocks the value; industrialisation shifts risk rather than removing it.
Standards Australia's SA HB 268:2026 glossary sets out the terminology. This summary is general information, not advice on your obligations.
Before you ask
The honest answers
Q
Is it really free?
Yes. No card and no trial that expires. You enter your name, email and organisation to get access, and your result is sent to that address. Run it as often as you like, for as many projects as you like.
Q
What happens to my project data?
Your result is shown on screen and sent to you by email. We handle your details in line with our privacy policy.
Q
Is a high result a recommendation to go modular?
No. It means the conditions MMC needs are in place. A targeted feasibility review would then test whether they hold for your project, and work out which system, at what cost and what programme.
Q
What is the result based on?
On Slattery's experience advising on Australian construction cost and delivery, including the five case studies in Thinking inside the box. The screen's logic is being validated against live Slattery projects and is refined as new project evidence arrives.
Q
Does Slattery sell modular buildings?
No. Slattery is a cost, carbon and construction advisory firm with no factory, no system and no supplier to favour. The screen's only interest is a straight answer.
Q
Can I screen a whole programme rather than one project?
Yes. Run each project through the screen, or talk to us about where MMC could pay off across the programme.
Q
Who built this?
Slattery, who have spent decades advising on Australian construction cost and delivery and have advised on modular projects across Australia. The logic comes from that practice, not a generic model.
More from Petra: estimate embodied carbon with the Carbon Index, or screen an existing building with Adaptive Reuse Screening.
Screen your project's
MMC suitability in minutes.
Free to use. Results on screen and by email.